Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Accounting / Markets Change workspace
AREAAccounting
PAGEEligibility Review
FACILITYNorth Ridge Dairy
CURRENT CONTEXTNorth Ridge Dairy
CONTROLLED CLAIM REVIEW

FARM-WI-01 · CARBON MARKETS

Eligibility review

North Ridge Dairy

Inspect controlled claim decisions alongside the existing project-readiness checks and selected methodology.

Registry CARMethodology CAR-LIVESTOCK-REVIEW

CLAIM POSITIONThe current plan's saved decision governs its proposed controlled claim. Legacy readiness scores do not clear that decision or determine eligible quantity.

Eligibility position

Controlled claim decisions remain separate
SELECTED REGISTRY
CAR
Climate Action Reserve
SELECTED METHODOLOGY
CAR-LIVESTOCK-REVIEW
Saved market selection
LEGACY INTERNAL CHECKS
10 / 10
Project readiness only
LEGACY PRELIMINARY ESTIMATE
47.020702
Existing estimate · credits
EXTERNAL CONDITIONS
05
Confirmation requirements
CONTROLLED ELIGIBLE CREDITS
Not determined
Inspect claim positions below
Controlled accounting → credit claim

Controlled claim eligibility and receipts

Position unavailable
A current administrator account with scope access is required to inspect controlled claim decisions. No eligibility conclusion is available.
CARBON MARKET PATH

Market lifecycle and accounting handoff

Move from market selection through external issuance, then hand issued credits into inventory.

PROJECT POSITION Stage 5 of 7
Complete Project position Viewing Upcoming
Scroll horizontally to view every stage
LEGACY READINESS BOUNDARY The existing internal score describes project readiness for verification review.

The legacy preliminary estimate remains 47.021 credits. Registry and methodology selection have not changed its inputs or quantity. It does not establish an eligible quantity for the controlled claims above or override a saved hold/exclusion.

LEGACY PROJECT READINESS

Existing internal checks · North Ridge Dairy

These existing readiness checks remain separate from the current controlled claim decisions.

LEGACY INTERNAL READINESS

Internally Eligible

100.0%

10 of 10 configured internal requirements currently pass.

PASSED10
REMAINING0
EXTERNAL CONDITIONS5
INTERNAL REQUIREMENTS

Evidence evaluated by the application

✓
Project Information · FACILITY_COMPLETE Facility information complete

Facility code and facility name are available.

Passed
✓
Environmental Accounting · LEDGER_AVAILABLE Carbon ledger available

61 carbon ledger records are available.

Passed
✓
Environmental Accounting · POSITIVE_CREDITS Positive credit estimate

47.021 estimated credits are available.

Passed
✓
Monitoring · DATA_QUALITY Data quality threshold met

Average data quality is 100.0%.

Passed
✓
Accounting Status · NO_DRAFT_RECORDS No draft accounting records

No draft accounting records remain.

Passed
✓
Accounting Status · ELIGIBLE_LEDGER_RECORDS Eligible ledger records available

61 ledger records meet the current internal eligibility rules.

Passed
✓
Registry Selection · REGISTRY_SELECTED Registry selected

Selected registry: Climate Action Reserve.

Passed
✓
Methodology · METHODOLOGY_SELECTED Methodology selected

Selected methodology: Livestock Project Protocol Review.

Passed
✓
Methodology · METHODOLOGY_CANDIDATE Methodology applicability confirmed

The selected methodology is currently a valid candidate for internal review.

Passed
✓
Registry Requirements · REGISTRY_REQUIREMENTS Registry-specific requirements satisfied

All configured registry-specific requirements are satisfied.

Passed
How the legacy internal-readiness score is calculated

Internal Eligibility Score = Passed Internal Requirements ÷ Configured Internal Requirements × 100. These checks use current facility, ledger, credit-estimate, data-quality, registry-selection, and methodology-selection evidence. They do not replace external protocol interpretation.

CONDITIONAL REQUIREMENTS

External confirmation required

?
EXTERNAL METHODOLOGY REVIEW · BASELINE_VALIDATION Baseline scenario validation

The baseline scenario must be validated against the selected methodology and North Ridge project circumstances.

External Confirmation Required
?
EXTERNAL METHODOLOGY REVIEW · ADDITIONALITY Additionality demonstration

Additionality must be demonstrated using the tests required by the applicable protocol.

External Confirmation Required
?
EXTERNAL METHODOLOGY REVIEW · REGULATORY_SURPLUS Regulatory surplus confirmation

The project activity must be confirmed as exceeding applicable legal and regulatory requirements.

External Confirmation Required
?
EXTERNAL METHODOLOGY REVIEW · ACTIVITY_ELIGIBILITY Methane activity eligibility

Methane capture, destruction, avoidance, and project-boundary eligibility must be confirmed against the actual protocol.

External Confirmation Required
?
EXTERNAL METHODOLOGY REVIEW · INDEPENDENT_VERIFICATION Independent verification

An approved independent verifier must reproduce and approve the claimed result before registry approval.

External Confirmation Required
LEGACY VERIFICATION WORKFLOW Continue to Verification Readiness

Legacy internal checks are satisfied. Opening verification does not clear a controlled claim exclusion or authorize additional issuance.

Continue to verification →