Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Facilities Change workspace
AREAOperations
PAGEMaintenance Details
FACILITYGreen Plains Organics
CURRENT CONTEXTGreen Plains Organics

FACILITY OPERATIONS · MAINTENANCE

Maintenance Details

Latest calibration

Inspect the recorded calibration for MLS-008, review its result and follow the supporting equipment record.

Recorded result
PASSResult stored with this calibration
Calibrated
Jul 2, 2026Recorded time · 00:00:00.000
This record's next date
Jun 24, 2027Latest recorded next-calibration date
Record position
LatestFor this equipment type and ID

Latest recorded schedule

Due later

The latest record's next-calibration date is more than 30 days after the assessment date.

Assessed Oct 3, 2026 · The schedule describes recorded dates; the calibration result is shown separately.
Search this equipment's history Latest by calibration timestamp, then record ID.
RECORDED SERVICE EVIDENCE

Calibration evidence

PASS
Technician
Jordan Lee
Certificate reference
CAL-MLS-008-2026
Previous accuracy
0.25 %
Measured accuracy
0.2 %

Accuracy values and the result are reproduced from calibration #8.

Recorded notes

Level sensor verified against manual tank-depth measurement.

FOLLOW THE ASSET

Equipment & current context

Level sensor
Calibrated equipment

MLS-008

Open the equipment for its recorded readings, configuration and measurement history.

Current tank assignment

Green Plains Feed Tank

MT-008 Open tank & readings